You are here

News

Techint Ingenieria y Construcción will participate in the development of projects for Pan American Energy and YPF in Argentina, and for British Gas (BG) in Bolívia.

The company will develop a project in campo Ibibobo (IBB), near to Sábalo, in Bolivia, for the client British Gas (BG), that is intended to increase the production of gas. The scope of both works includes the development of basic and detail engineering, the management of supplies, inspection, technical assistance during the construction and drafting of documents. The agreement shall be in force within a total term of 19 months. 

On the other hand, Pan American Energy (PAE) attributed to Techint in Argentina the development of Front End Engineering Design (FEED) for the conversion of a mixed cycle of the Thermal Power Plant of Cerro Dragón, located at 60 kms from Comodoro Rivadavia, in the province of Chubut. The agreement shall be executed together with Sener, that will work in his branches in Argentina and Spain. The term of execution for the first stage is as of 6 months and for the second is as of 20 months.

Finally, to YPF attributed to Techint the development of extended Basic Engineering of a gas pipeline through a frame contract in force. The channel shall transport 1.6 MMSm3 of gas per day, from the plant El Portón, in the Province of Neuquen, to the facilities of Mina Potasio Río Colorado, property of Rio Doce Valley in the Province of Mendoza. The term of execution is as of 80 useful days and this work is the third performed for YPF within this Frame Contract.