You are here

October 31, 2018
Techint Engineering and Construction and Tenaris took part in the recent "High-Level Energy Conference", held in Linz and organised by the Austrian Presidency of the Council of the European Union.

June 11, 2018
The new pipeline is 58 kilometers long and connects the Central Gas Processing Facility (CPF) with the trunk gas pipeline system, transporting Tecpetrol's output in Fortín de Piedra out of the area.
May 24, 2018
The Techint Engineering & Construction-Dycasa joint venture has completed the construction of this station, a major milestone which adds another kilometer to the H Line route, envisaging the circulation of more than
April 30, 2018
Techint was awarded the ISO 37001 Certification for its Anti-bribery Management System, and the ISO 19600 Declaration of Conformity for its Compliance Management System.

January 10, 2018
Techint E&C managed the construction of the greenfield monumental seamless pipe plant of TenarisBayCity, which was inaugurated on 11 December, in Texas, United States.

News Archive