You are here

News

This is the expansion project of the gas treatment plant the TOTAL company has in Rio Cullen, Tierra del Fuego. The company is working on the Basic Engineering.

Techint E&C has been awarded a new contract with TOTAL to develop the extended Basic engineering of the project, which aims to increase the processing capacity of the gas plant due to the incorporation of the Fenix offshore platform.

To do so, some equipment shall be installed in the plant -reception and launch traps; new scrubbers and a Lean MEG injection system; Lean MEG filters and an injection pump to the platform-, as well as the piping and instrumentation. In addition to this, the checks and modifications of existing structures shall be performed.