You are here

News

The project is for the construction of two fixed oil platforms, WHP-1 and WHP-2

Techint Brazil has signed a Letter of Intent with OSX to build two fixed platforms of 153 meters in height, including topsides, jackets and pilings at its offshore unit construction base in Pontal do Sul, Paranaguá.

The platforms will eventually be deployed in the Campos bay 90 km. off Rio de Janeiro.